President Emomali Rahmon attended opening of industrial, educational, and cultural facilities in Bobojon Ghafurov district

On November 20, the President of the Republic of Tajikistan, Leader of the Nation, Honorable Emomali Rahmon, at the “Chavroq” Limited Liability Company, also remotely inaugurated 6 facilities of various purposes, built with the participation of state bodies and local entrepreneurs, in Bobojon Ghafurov district.
The first facility that was put into operation in virtual format is the production enterprise of the “Khishti orom” Limited Liability Company in the village named after Dadoboy Kholmatov, which was built by local entrepreneurs.
This enterprise, which employs 25 local residents, produces 100 thousand bricks per day.
The enterprise produces bricks using modern equipment, including robots, which reduces manual labor.
The lightweight brick production plant of the “Fayzi Buston” Limited Liability Company was put into operation in the Rukhak area of the Ghoziyon village.
32 million somoni were spent on the construction and commissioning of the plant, and using modern equipment and machinery, mainly imported from abroad, it is possible to produce 72 thousand cubic meters of lightweight bricks or aerated concrete blocks per year. The plant has provided 55 jobs.
“Anko-Invest” Limited Liability Company, one of the largest manufacturing companies in the Sughd Province, built a chicken breeding factory in the village of Yova, Bobojon Ghafurov district, as part of the development measures to mark the 35th anniversary of the State Independence of the Republic of Tajikistan. The factory is capable of producing 6 million chickens per year.
During the presentation of production opportunities and capacities, the President of the Republic of Tajikistan, Emomali Rahmon, was informed that during the past 10 months of this year, 22 new industrial plants and enterprises were put into operation in the Bobojon Ghafurov district, creating almost 200 jobs.
On this day, the Head of State, Emomali Rahmon, also commissioned the educational building, canteen and dormitory of the Vocational and Technical Lyceum of the Bobojon Ghafurov district, which was renovated at a cost of almost 4 million somoni.
The complete renovation and equipping of classrooms, educational workshops, and other facilities of the lyceum was carried out with the funding of the Executive Body of State Power of Bobojon Ghafurov district, and construction work was carried out by domestic companies.
Another private kindergarten was commissioned in the center of Bobojon Ghafurov district. The “Akhtaroni Mehr” preschool educational institution was built by a local entrepreneur in the light of the constructive initiatives of the Head of State and is designed to educate and raise 360 children.
The Leader of the Nation was informed that this preschool educational institution provides favorable conditions for the education and upbringing of children, as well as the necessary conditions for play and recreation.
On this day, the President of the country, Emomali Rahmon, also remotely commissioned the Dadoboi Kholmatov Rural Cultural Palace, which was built with the funding of the Executive Body of State Power of the Bobojon Ghafurov district.
This beautiful and magnificent two-story palace consists of a spacious hall with a capacity of 300 seats, 5 classrooms for students of the branch of the art school, a library, a wedding hall and other auxiliary facilities.
On the second floor of the facility, 8 offices have been built for the administration of the Dadoboi Kholmatov Rural Community.
It is worth noting that a total of 230 people were provided with permanent jobs in the 6 facilities that the Head of State, His Excellency Emomali Rahmon, remotely commissioned in the Bobojon Ghafurov district.



